CES 2027 Booth Design & Construction Vendor Recommendations: 4 Selection Criteria for First-Time Exhibitors
A Practical Guide for SME Managers Preparing an Independent Booth for CES 2027
The most common question that arises right after deciding to participate in CES is this:
"Which booth contractor should we hire?"
A simple search reveals countless exhibition design companies, but comparing them is difficult because each company's scope of service and breakdown of quotes vary wildly. Especially for companies participating in CES for the first time, it is not easy to judge whether they should only outsource the design, include construction as well, or who will take responsibility for on-site operations.
This article outlines the following three key aspects:
What booth size is possible with a budget of KRW 100M to 150M?
Essential criteria to check before selecting a contractor.
A comparison of CES contractors frequently considered by Korean companies.
What to Know Before Selecting a CES Contractor
Many companies start by comparing contractors right away, but that is a misstep. You must first understand what costs are incurred to properly compare quotes.
What booth size can you get with a budget of KRW 100M to 150M?
CES independent booths are generally classified as follows:
Classification | Size | Typical Exhibitors |
Extra-Large | 30+ booths | Major Conglomerates |
Medium-Large | 10–20 booths | Mid-sized Companies |
Small | 4–10 booths | SMEs, Startups |
With a budget around KRW 100M to 150M, companies generally prepare an independent booth of 4 to 10 booths in size. In this range, rather than simply making the booth large, the following factors are crucial:
Securing product demonstration space
Designing visitor traffic flow
Structuring consultation areas
Securing storage space
In reality, even for booths of the same size, lead generation performance can vary significantly depending on the spatial layout.
Where is the budget spent?
This is the part that first-time participants are most curious about. A CES independent booth budget roughly consists of the following items:
Item | Share |
Booth Space Rental | 30–40% |
Design & Construction | 30–40% |
Shipping & Installation | 10–20% |
Electricity & Internet | 5–10% |
Other Operating Expenses | 5–10% |
Therefore, if you judge the total cost based only on the design and construction quote, a huge discrepancy can occur compared to your actual budget.
Frequently Occurring Failures in CES Preparation
Before looking at the selection criteria, it is necessary to understand why they matter so much through real-world examples.
Case 1. The quote was cheap, but additional costs were added on-site
In many cases, drayage (Material Handling Fee), which was not included in the initial quote, is billed additionally right before installation.
Case 2. Omission of electricity application
There are cases where the application for an electricity connection for product demonstrations is missed, leaving the team scrambling to resolve it right up until the exhibition starts.
Case 3. Absence of on-site support staff
Schedule delays occur during the installation process, but because there is no resident on-site staff, it takes a long time to resolve the problem.
Most of these issues can be vetted and prevented during the contractor selection stage.
4 Must-Check Criteria When Selecting a CES Contractor
① Do they have actual construction experience at CES?
CES has a different operational structure than domestic exhibitions in Korea. In particular, electricity, internet, drayage, and rigging must be applied for separately through the official service providers of the exhibition hall. Therefore, it is more important to check if they have on-site experience at CES rather than just general overseas exhibition experience.
Do you have recent CES construction case studies?
Do you have a local partner in the US?
Is on-site support available during the installation period?
② Are the line items in the quote detailed?
Even for the same amount, the scope of inclusion can vary greatly.
Items that must be verified:
Design
Structure Manufacturing
Graphic Printing
Lighting
Shipping
Installation
Dismantling
Drayage
Electricity
Internet
Rigging
It is best to request the contractor to structure it like this:
"Please organize the quote by clearly separating included items from separate cost items."
③ Are both installation and dismantling included?
Sometimes only installation is included, and dismantling is a separate cost. Since dismantling costs at US exhibitions are larger than you might expect, you must clearly verify the contract scope.
④ Is on-site resident support available?
Unexpected variables always occur on-site at CES:
Electrical connection issues
Shipping delays
Requests for additional labor
Changes in on-site regulations
Therefore, contractors with on-site resident personnel are highly advantageous.
Checklist to Prepare Before Contacting Contractors
To properly compare quotes, you must provide the same conditions to all contractors. It is recommended to organize the following details beforehand.
Booth Basic Information
Applied booth size
Whether it is a corner booth
Number of open sides
Exhibition Operation Plan
Number of products to exhibit
Product dimensions
Whether electricity is required
Whether live demos will be conducted
Spatial Layout
Number of consultation tables
Whether storage space is needed
Whether a meeting room is needed
Budget
Estimated budget range
Whether the Export Voucher (수출바우처) will be utilized
Comparison of CES Contractors Frequently Considered by Korean Companies
Classification | Epic Design Group | DIEZEL | MyFair |
Features | Design-centric | Focused on overseas exhibition construction | End-to-end support from prep to construction |
Overseas Construction Experience | Yes | Yes | Yes |
Export Voucher | Needs verification | Available | Available |
Suitable For | Companies prioritizing design differentiation | Companies valuing US exhibition experience | First-time CES participants |
Strengths | Design quality and finish | Overseas construction expertise | Integrated support for admin, design, and construction |
Which company should choose which contractor?
✅ Go with a Design-Specialized Agency if:
You want to emphasize brand experience.
Design differentiation is your top priority.
✅ Go with an Experienced Overseas Construction Agency if:
You prioritize extensive experience with US exhibitions.
You value a proven track record in on-site troubleshooting.
✅ Go with a One-Stop Support Agency if:
This is your first time at CES.
You lack internal manpower.
You want help right from the initial application process.
You need to utilize the Export Voucher.
Conclusion
The most important factor in choosing a CES contractor is not the name of the company, but your criteria for comparison. First, you must understand the budget structure and check whether drayage, electricity, internet, and dismantling costs are included in the quote. Furthermore, reviewing their CES on-site experience and troubleshooting systems will help reduce unexpected additional costs and operational risks. Especially for companies participating with an independent booth for the first time, it is wise to check if they can support not only design and construction but also the application process, booth booking, and Export Voucher utilization.
Before you begin comparing contractors, it is highly recommended to create a Request for Proposal (RFP) with identical conditions and distribute it to multiple vendors.